This week got off to a slow start compared to past action-packed weeks. Not that we’re complaining. The mud room floor was stripped of its dingy old linoleum and refitted with new ceramic tiles. The father and son duo of electricians added outlets and cleaned up the electrical panel while perfecting their comic banter all the while.
And then things got interesting when the countertops arrived. What a big difference! The plumber returned today to hook up the water and gas lines to the sink and appliances. Our kitchen is technically operational! Not really though, there’s lots left to do.